A U.S. mini-mill bar producer was losing more than 1,100 tons of raw material every year, not from defects, not from damage, but from the limitations of its own materials-handling equipment. Two existing P&H bridge cranes in the billet bay were undersized for the mill’s production goals, forcing operators to torch-cut every billet down to 11 or 14 feet before lifting and creating unavoidable scrap with every cut. The fix was not just bigger cranes. It was a complete rethink of the materials-handling line: refurbished higher-capacity bridge cranes, a structural support system tall and wide enough to house them, modern AC controls replacing the legacy DC system, and tight integration with a new energy-efficient gas furnace coming online in parallel, all while production stayed live.
Han-Tek delivered the crane portion of the program as a single coordinated multi-vendor build, with the cranes refurbished at a Wisconsin specialist shop and custom climate-controlled operator cabs fabricated in Canada, then integrated and installed on-site by Han-Tek’s own crew. Final certified load tests were completed in November 2004. Within two years, yield improvements alone paid back the cranes, the new structural system, and the new furnace combined.
"*" indicates required fields